5.56MM GREEN TIP LONG LEAD BULLET L C 8 3

$6.00

Out of stock

SKU: 556mm-green-tip-long-lead-bullet-l-c-8-3 Categories: , ,

Description

5.56MM GREEN TIP LONG LEAD BULLET. HEADSTAMP L C 8 3.

Additional information

Weight 6.4 oz
Dimensions 5 × 1 × 1 in

Reviews

There are no reviews yet.

Be the first to review “5.56MM GREEN TIP LONG LEAD BULLET L C 8 3”

Your email address will not be published. Required fields are marked *